Sign in   |   Join

17.2TH/s, 1430W+10%, the world most powerful and efficient BTC Miners

ANTMINER Terminator 2 (T2) Miner Ship in 10 days

Price:
Speed:Weight:
US $1150
BTC payment : according https://btc-e.com, last price rate
40HK
1800g
Product Description

SpecHashrate: 17.2TH/s (+/-5%)

Power Consumption: 1430W + 10% (nominal mode, at the wall, with 93% efficiency PSU, 25°C temperature )
Chip Type: Terminator 2 (T2) ASIC
Dimensions: Single Tube, 400mm(L)*180mm(W)*150mm(H)
Net Weight: 7.5KG
Ambient Temperature: 0°C to 40°C
Network Connection: Ethernet


Shipping&Packaging

1. Delivery time: first pay, first served. Goods will be sent within three days after payment confirmation.

2. Please be aware: T2 PSU is inclusive, and the PSU we provide is specially customized for our miners. Since customers require different types of plugs, the PSU does not contain 220V (110V) AC cables. You can order the standard IEC C14 AC power cable to use with the PSU.

3. T2 PSU is more than 1600W, so please purchase AC cable with 3*1.0 specifications, and 3 wire cores with diameter no less than 1.0mm.

4. Please write the recipient's name, contact information and address carefully. We will ship according to the information given to us. You will be responsible for any damages or losses caused by errors in the information.

5. We guarantee the safety of the goods until they are in the hands of the shipping carrier. Once the shipping carrier has accepted the goods, the ownership of them will be transferred to customers. Any damage or losses of the goods during transport and import customs clearance will be charged to the buyers.

6. In order to increase the in transit security of the high-value miner, we are implementing insurance fees with the shipping fees, starting from December 26th, 2017. We will use the company name (if not available, then the name of the buyer) as the insured party. Please make sure that the information is correct.

 

Warranty
All  T2 will be tested by factory before shipment and certified by SEGREE The post-sales service policy is as follows. After payment, your order will be processed immediately.

180 days parts warranty for any miners directly purchased from SEGREE (counting upon miner arrival). If any problem, please leave a Ticket Type: C1 message on our message board. Our technical support team will get in touch with you asap.

Please don’t send any machine or parts without contacting the technical support team first. Any loss or damage as a result of lack of contact will be the responsibility of the customer.

The price of miners may be adjusted in response to market condition changes at any time without prior notice or price compensation to customers.

The warranty expires in the following cases:

Miner is demolished, privately altered or component replacement by customers;
Lightning, voltage surges, poor quality power supply causing damage;
Circuit boards and components damaged by water, exposed to moisture or corroded;
The circuit board or the chip is completely burned;
Excessive Over-clocking in a overheating environment.
If above case happens, services of your miner maintenance will be charged. For the specific procedures, please refer to the after-sales process.